Difference between revisions of "Enhancing Construction Project Collaboration and Transparency: An Integrated Contract Management System with BIM and Smart Contract"

From Design Computation
Jump to: navigation, search
Line 6: Line 6:
  
 
[[CBC 2023]] presentation by [[Xuling Ye]], [[Liu  Liu]] and [[Markus Konig]]. https://doi.org/10.47330/CBC.2023.GGBX2206 | Watch [[File:VideoRecord-Icon.png |Left|22px|link=https://youtu.be/]] | [[File:Slides-Icon.png |Left|30px|link=https://www.dropbox.com/]]
 
[[CBC 2023]] presentation by [[Xuling Ye]], [[Liu  Liu]] and [[Markus Konig]]. https://doi.org/10.47330/CBC.2023.GGBX2206 | Watch [[File:VideoRecord-Icon.png |Left|22px|link=https://youtu.be/]] | [[File:Slides-Icon.png |Left|30px|link=https://www.dropbox.com/]]
 
 
[[File:.png|center|800px]]
 
 
  
 
=Abstract=
 
=Abstract=
missing
+
TBC
  
 
=Keywords=
 
=Keywords=
 
[[Integrated Project Delivery]], [[Project Collaboration]], [[Traceability]], [[Transparency]].
 
[[Integrated Project Delivery]], [[Project Collaboration]], [[Traceability]], [[Transparency]].

Revision as of 12:26, 12 January 2024

CBC-Logo.png
CBC 2023 presentation by Xuling Ye, Liu Liu and Markus Konig. https://doi.org/10.47330/CBC.2023.GGBX2206 | Watch Left | Left

Abstract

TBC

Keywords

Integrated Project Delivery, Project Collaboration, Traceability, Transparency.